Photonics Spectra BioPhotonics Vision Spectra Photonics Showcase Photonics Buyers' Guide Photonics Handbook Photonics Dictionary Newsletters Bookstore
Latest News Latest Products Features All Things Photonics Podcast
Marketplace Supplier Search Product Search Career Center
Webinars Photonics Media Virtual Events Industry Events Calendar
White Papers Videos Contribute an Article Suggest a Webinar Submit a Press Release Subscribe Advertise Become a Member


Smartenergy Names New Leaders, Upgrades Solar Factory

Smartenergy Renewables AG has completed the conversion and upgrade of its crystalline solar panel manufacturing facility in Luckenwalde, Germany, and is aiming for a maximum capacity of 120 MW.

Meanwhile, the company has hired two new executives and named a new board member. Dr. Stefan Parhofer, former CEO of Gehrlicher Solar USA, was named chief project officer; Werner Matuschek will manage the company’s panel operations; and Dr. Erik Oldekop, formerly in charge of renewable energy investments at aeris Capital AG, was appointed to the board of directors.

The 295-W utility panels manufactured at the Luckenwalde facilty are based on a glass/glass panel design. The hermetic edge seal of the solar panels eliminates induced degradation losses and ensures a longer lifetime, and its frameless construction dramatically reduces soiling losses, the company said.

Smartenergy Renewables acquired the factory from U.S.-based Nanosolar Inc. in July 2013. To date, 1.9 MW of the utility panels manufactured there have been installed in a solar park in southern Germany.

For more information, visit www.smartenergy.net.

Explore related content from Photonics Media




LATEST NEWS

Terms & Conditions Privacy Policy About Us Contact Us

©2024 Photonics Media